Since the beginning of December, the gas pipeline connection built in Paldiski by Estonia's transmission system operator Elering is ready to receive gas into its network.
The construction of the LNG terminal in Paldiski, Estonia, has now moved to laying the offshore pipe which will connect the gas infrastructure on land and the equipment on the pier.